sens tworzenia

Budimex S.A.

01-040 Warszawa

ul. Stawki 40

centrala: +48 22 623 60 00

fax +48 22 623 60 01

e-mail: info@budimex.pl

www.budimex.pl

 

Budimex has existed for more than 45 years. Currently, as an infrastructure and service company, Budimex focuses on the Polish market. As a general contractor, it operates in the following infrastructure sectors: roads, railway, airports; commercial, energy, industrial and green building engineering. The company has gradually increased its involvement in the facility management (real property and infrastructure services) and waste management sector. Since 1995 the company has been listed at the WSE, and since 2011 it has been included in RESPECT – the index of the most responsible listed companies. Its strategic investor is Ferrovial – a Spanish company with a global reach. Budimex Group has more than 5 thousand employees and it cooperates with 12 thousand business partners a year. Budimex Group consists of Budimex Nieruchomości and Mostostal Kraków.

 

 

Scope of works in the area of railway construction:

  • Design, construction, modernisation of railway facilities including related infrastructure,
  • Design and construction of railway track surface,
  • Design and construction of engineering structures,
  • Design and construction of track substructure including the construction of protective layers and earthworks,
  • Design and construction of railway crossing track and motor road surface,
  • Removal of mining damage,
  • Wide scope maintenance works on tracks, turnouts and railway engineering facilities,
  • Sidetrack repairs,
  • Railway lines dismantling,
  • Steel surface refurbishment, 
  • Earthworks,
  • Handling and storage of aggregate materials and sales of ballast materials,
  • Transport and lifting services.

Certificates and licences:

  • Safety Certificate confirming acceptance of the safety management system in the European Union (PL 1120100017),
  • Occupational Safety and Hygiene Management System Certificate according to PN - N  18001:2004,
  • Environmental Management System Certificate according to PN-EN ISO 14001:2005,
  • Management System Certificate according to EN ISO 9001:2008,

High quality works are carried out by specialised teams of workers using specialist technologies. The materials and performance techniques, equipment, diagnostics and control methods meet the technical requirements of the Customer. Works are carried out in compliance with the conditions ensuring safe railway traffic according to the rules of works and work instructions applicable to the Customer’s operating area.

 

 

 

1. LCC Iława – Construction works within the scope of modernization of line no. 9 on the section from kilometre 184.800 to kilometre 236.920 covered by the Local Control Centre in Iława

  • Term: June 2011 – December 2014
  • Value: PLN 698 million

 

2. PKM – Design and construction of a two-track railway line of the Pomeranian Metropolitan Railway on the section from the station Gdańsk Wrzeszcz to the connection with railway line no. 201 (Kościerzyna - Gdynia), total length about 17 km.

  • Term: June 2013 – October 2015
  • Value: PLN 546.8 million

 

 

3. PKP Bydgoszcz – first stage of the construction of the Integrated Transport Centre in Bydgoszcz 

  • Term: May 2014 – November 2015
  • Value: PLN 136.8 million

 

4. PKP Wrocław Główny – Reconstruction of the historic railway station including technical railway infrastructure

  • Term: March 2010 – May 2012
  • Value: PLN 274.7 million

 

Wersja do druku Wersja do druku | Mapa witryny
© Całość praw autorskich - Antoni Bochen, Filip Wiśniewski